Pipeline Integrity


Overview

Due to PHMSA 49CFR191 and 49CRF192 more stringent regulation on transmission and distribution inspection and monitoring.


Application

Asset integrity post pigging/ILI examinations … <300F

  • During Direct Assessment (DA), operator must make the decision to “bury and hope” or immediate fix/repair based on wall-thickness
  • Operator elected for 3rd option – to monitor – to learn if pitting was episodic or growing and if so, at what rate


Product Used

  • smartPIMS Modbus configuration with 8 dual element probes permanently attached to monitor all localized corrosion “low spots” as identified by masses screening.
  • smartPIMS systems are completely buried after DA is complete
  • Operator will send personnel to defined locations quarterly to collect data with tablet


Outcome

Operator was able to continue normal pigging/ILI inspection intervals and have access to buried asset information without excavation while remaining in PHMSA compliance.

Share this post

Enhancing Efficiency and Safety: Xcel’s Nuclear Sites Harness the Power of JAWS 2.0

Foreign Objects Search and Retrieval (FOSAR) is a critical task in nuclear power plants, and having efficient tools like the JAWS 2.0™ is paramount to ensure safety and operational efficiency. Xcel’s nuclear sites, Monticello and Prairie Island, recently integrated the JAWS 2.0 ultimate kits into their FOSAR capabilities. These kits proved their effectiveness during routine maintenance at Monticello’s Spent Fuel Pool.

Read More »
Sensor Networks, Inc.